Install slide raft assembly at each LH and RH cabin door exit. Installation in accordance with DAS-1-WE Approved United Air Lines Drawing List dated February 17, 1977 covering COA 3-2066, or later FAA approved revisions.
Install slide raft assembly at each LH and RH cabin door exit. Installation in accordance with DAS-1-WE Approved United Air Lines Drawing List dated February 17, 1977 covering COA 3-2066, or later FAA approved revisions.
Please contact modification supplier for further details.
STC Status: Reissued
STC Date: 30/11/11
Responsible Office: Ft. Worth Special Certification Office (ASW-190), Tel: (817) 222-5190
Boeing Company, The