A330-223 Egide Safe Protection System (SPS) modification.This modification has been achieved in three phases.The initial phase has prepared the aircraft belly area to receive a podby relocating antennas, drain mast, and provisioning some otherequipment.The second phase has checked the functionalityT...
A330-223 Egide Safe Protection System (SPS) modification.This modification has been achieved in three phases.The initial phase has prepared the aircraft belly area to receive a podby relocating antennas, drain mast, and provisioning some otherequipment.The second phase has checked the functionalityT...
Please contact modification supplier for further details.
STC Status: Revision Level REV. 4
STC Date: 04/11/16
Responsible Office:
A330-223