Overview

STC Number
:
Contact Details
:

Introduction

Installation of a powered cargo roller system


Boeing 747
€ RFQ

Product Description

Installation of a powered cargo roller system

Please contact modification supplier for further details.

STC Status: Reissued
STC Date: 03/08/04
Responsible Office: Chicago Aircraft Certification Office (ACE-115C), Tel: (847) 294-7358

Boeing Company, The

  • 747-100 Series
  • 747-100B Series
  • 747-100B SUD Series
  • 747-200B Series
  • 747-200C Series