Structural provisions for 747-8i belly camera installation between theNLG bay and the belly fairing at the lowest point of the fuselage. Itcontains:- Attachment to the aircraft structure through brackets- Outside fairing- Installation of a wiring feed-thro
Limitations: none.
Conditions: Prior to installation of this modification it must be determined thatthe interrelationship between this modification and any other previouslyinstalled modification and/ or repair will introduce no adverse effectupon the airworthiness
of the product.
Please contact modification supplier for further details.
STC Status: Revision Level: REV. 1
STC Date: 24-7-2012
Responsible Office:
B747-8