Installation of BRITE SAVER 2 Data Monitoring SystemRevision 1 - covered a documentary change to STCRevision 2 - covered torque and memory management minor changeRevision 3 - covered installation of ultrasonic air/ground switch,second possible location of the Brite Saver 2 on the instrument paneland... EASA.R.S.01399
Installation of BRITE SAVER 2 Data Monitoring SystemRevision 1 - covered a documentary change to STCRevision 2 - covered torque and memory management minor changeRevision 3 - covered installation of ultrasonic air/ground switch,second possible location of the Brite Saver 2 on the instrument paneland...
EASA.R.S.01399
Please contact modification supplier for further details.
STC Status: Revision Level REV. 4
STC Date: 15/05/12
Responsible Office:
AS355N, AS355NP
AS355F1, AS355F2