Overview

STC Number
:
Contact Details
:

Introduction

Installation of Floor Proximity Lighting System in accordance with Vista Manufacturing, Inc., Drawing List DC-9-1000, Revision C, Dated October 7, 1986 or later FAA approved revision


McDonnell Douglas DC9
€ RFQ
McDonnell Douglas MD81
€ RFQ
McDonnell Douglas MD82
€ RFQ
McDonnell Douglas MD83
€ RFQ
McDonnell Douglas MD87
€ RFQ

Product Description

Installation of Floor Proximity Lighting System in accordance with Vista Manufacturing, Inc., Drawing List DC-9-1000, Revision C, Dated October 7, 1986 or later FAA approved revision

Please contact modification supplier for further details.

STC Status: Reissued
STC Date: 30/09/11
Responsible Office: Los Angeles Aircraft Certification Office (ANM-100L), Tel: (562) 627-5200

Boeing Company, The

  • DC-9-51
  • DC-9-81 (MD-81)
  • DC-9-82 (MD-82)
  • DC-9-83 (MD-83)
  • DC-9-87 (MD-87)