Install B.F. Goodrich pneumatic de-icer system listed on Master Drawing List Report No. 74-04-047B.
Install B.F. Goodrich pneumatic de-icer system listed on Master Drawing List Report No. 74-04-047B.
Please contact modification supplier for further details.
STC Status: Reissued
STC Date: 01/03/96
Responsible Office: Chicago Aircraft Certification Office (ACE-115C), Tel: (847) 294-7358
Sabreliner Corporation