Installation of Main Deck and Lower Lobe Floor modification and the 9G Restraint System to freighter conversion.
Installation of Main Deck and Lower Lobe Floor modification and the 9G Restraint System to freighter conversion.
Please contact modification supplier for further details.
STC Status: Amended
STC Date: 15/01/03
Responsible Office: Chicago Aircraft Certification Office (ACE-115C), Tel: (847) 294-7358
Boeing Company, The